Typical Projects, Clients and Testimonials

At EcoPowerSupplies we strive to achieve the highest levels of customer satisfaction within the power protection industry. We take a consultative approach to every project, listening to our clients and taking the tim to understand their needs and specifications to ensure we deliver the right power protection solution to solve their power problems and improve their energy efficiency. As part of our management systems we formally review every project, product and service we supply, with clients invited to rate us on a number of factors. Our current rating for e-commerce order satisfaction is 4.95/5.00 and our on-site clients rate us at 98% for customer satisfaction.

Case studies and testimonial contacts are available upon request. This page provides an overview on:

For more information please contact us on 0800 612 7388 or complete our enquiry form.

Typical Customer Projects

This sample list is intended to provide you with a range of power protection projects we have delivered for a variety of clients and industries. If you cannot find one specific to your needs please let us know.

Aberystwyth University Logo

The Aberystwyth University project was won after a competitive tender process for the supply and installation of two 60kVA UPS systems. One was to centralise power protection within a new datacentre facility and the other as a replacement upgrade for an existing transformer-based UPS. For the installation we used two Huawei 60kVA UPS5000A systems. Their compact footprint and energy efficiency made them ideal for the project. One of the installations was completed within a basement plant room and the other inside the new datacentre building. For this we also had to complete extensive electrical works with the installation of overhead cables to provide A and B supplies and new PDUs for each of the rack cabinets. The project used over 2.5tonnes of Yuasa batteries with some complex delivery logistics and took 5 days to complete. A three year Gold maintenance plan is now in place for each system.

Aldi Logo

The Aldi project involved the supply and installation of a Riello 10kVA Multi Sentry UPS with a maintenance bypass switch for a critical head office IT system. The electrical installation and commissioning was completed by our team which also includes Riello UPS certified service engineers.The Multi Sentry had an internal battery pack and provided the company with a compact footprint and high efficiency UPS system. The system was supplied with a 3 year warranty.

Birmingham University

The Birmingham University project saw a Riello Multi Sentry 60kVA UPS being used to protect sensitive scientific medical equipment which required continuous power for several hours in order to protect the data analysis process. The UPS system was installed with a 3m runtime battery pack, external maintenance bypass and NetMan IP monitoring card at the Queen Elizabeth Hospital. The battery pack was sized to provide a longer runtime at the reduced load and be supported by the standby power generator.

Bournemouth University Logo

The Bournemouth University project was won after a competitive tender process for the supply and installation of a 120kVA UPS system that could be extended to 200kVA capacity at a later date. The project was part of an energy saving program on the site and involved the replacement of an existing transformer-based UPS system. The tender was won with a Huawei 120kW Modular UPS5000E system supplied in a 200kW frame. The existing battery set was tested by our engineers and passed as suitable for use with the new modular UPS. The Huawei modular UPS has helped to achieve a 50% reduction in datacentre energy usage since installation.

Cumbria Police Logo

The Barrow-in-Furness Police Station installation was an extensive project designed to protect vital IT and telecoms within this blue-light operations facility. The project involved the supply and electrical installation of two parallel N+1 40kVA Riello Multi Sentry UPS systems completed with battery sets and maintenance bypass systems. The project ran over 4 days and involved onsite battery builds and electrical works by our certified UPS engineering and electrical contracting team.

Evolutions TV Logo

The Evolutions TV project was part of a project to protect a purpose built, production facility in London. The project involved the replacement of an existing monoblock UPS with a more up to date high efficiency and energy saving technology. The project involved the decommissioning and removal of an existing UPS and its the installation of a new Riello Multi Sentry 30kVA UPS with an internal battery pack.

HellermanTyton Logo

HellermannTyton is a British registered company with affiliated companies in 36 countries manufacturing and supplying products for fastening, fixing, identifying and protecting cables and their connecting components. In the UK the company operates several manufacturing sites that are now protected by EcoPowerSupplies. These include Manchester, Cannock and Plymouth. At the Manchester site EcoPowerSupplies provided external maintenance bypass switches during a datacentre shutdown, allowing the the UPS to be maintained and have their batteries replaced at a later date. At the Cannock site a Power Control B500 single phase 10kVA UPS was installed to protect the main IT server room and a B400R 1kVA rack mount UPS was installed in a separate comms cabinet with PDUs. At the Plymouth site two B500EVO 10kVA 3/1 UPS systems were installed with SNMP cards and two automatic transfer switches to give the loads dual redundant power supplies. The work was completed during a planned weekend shutdown for the manufacturing site.

Honeywell Logo

The Honeywell project involved the supply and installation of a Riello Multi Sentry 60kVA UPS with a NetMan SNMP remote monitoring interface and wall mounted maintenance bypass within their UK headquarters. The work was completed by our team of electricians and Riello UPS certified service engineers.

Instituto Cervantes

EcoPowerSupplies were called in as part of the fit-out of a new office building for The Instituto Cervantes, London. The Instituto Cervantes is a non-profit organization founded by the Government of Spain in 1991. Its mission is to promote Spanish language teaching as well as that of Spain’s co-official languages, in addition to fostering knowledge of the cultures of Spanish-speaking countries throughout the world. The project involved the installation of a 40kW Ingenio Borri UPS system with an external maintenance bypass switch. The EcoPowerSupplies installations team liaised with the on-site electrical contractors and commissioned the new UPS system reading to supply the institute’s IT and comms systems. Logistics was key to this installation with site surveys performed to plan the delivery which required entry into the building via a stairway with a tight-corner.

Leeds Beckett University Logo

The Leeds Beckett University project was won against strong competition following a comprehensive site survey and competitive bidding process. The site had traditionally used a decentralized power protection plan with UPS deployed within each server rack. Following recent UPS issues, the university team decided to opt for a centralised power protection plan.

The Eco Power Projects team installed a Power Control B500EVO 3/1 configured 20kVA UPS complete with a 55minute battery pack and wall mounted maintenance bypass. Twelve additional PDUs were provided to deliver power from the UPS to the server racks providing A and B supplies to the dual corded servers. UPS remote management software was also installed using SNMP. As part of the fit-out, the Eco Power Projects team also provided electrical installation and construction works in the server room to the walls and ceiling.

Oxford Nanopore

Oxford Nanopore Technologies develops and commercialises nanopore-based electronic systems for the analysis of single molecules, including DNA, RNA and proteins. Their Oxford headquaters runs two datacentres for which EcoPowerSupplies provided two 60kVA Riello Multi Sentry UPS systems complete with battery sets, SNMP interfaces and external maintenance bypasses. The UPS were sized to provide an initial runtime, followed by a longer backup period once some of the critical IT systems had closed down. The two data centres were close-by but differed in room layout and configuration due to the raise floors within the suites. The UPS installations were completed successfully and interface with the local standby generator for additional backup power.

South Gloucester and Stroud College

South Gloucester and Stroud College contacted the Eco Power projects team their existing 10kVA UPS system had failed and required urgent replacement. The installation was relatively straight forward following the safe removal of the existing UPS for disposal and recycling.

The Eco Power Projects team installed a Power Control B500EVO 10kVA UPS with a 30minute runtime battery in a matching battery cabinet and wall mounted maintenance bypass switch. The UPS is monitored over the college network via SNMP and the UPS monitoring and control software packaged supplied by EcoPowerSupplies.

TeleBizz Logo

TeleBIZZ provide a specialist virtual reception and call centre service for companies like BP and must maintain 24/7 guaranteed uptime to support their EMEA emergency response team. The project involved the removal of an existing UPS system and replacement with a Huawei UPS5000E 80kW modular UPS system configured N+1. A further 40kW module can be added to the frame at a later date. The existing battery set was tested for conductance and overall health and was re-used with the new Huawei UPS.

United Christian Broadcasting Logo

United Christian Broadcasters is a 24/7 provider of Christian radio and TV programs that are broadcast around the world. The EcoPowerSupplies team was challenged with installing a new Riello 80KVA Multi Sentry UPS system complete with a 2hour battery installation, SNMP network monitoring, interfacing with the existing generator set and providing continuity of service. The head office installation involved the removal of an existing UPS system for eco friendly disposal and a recabling to the existing generator supply. The entire project was completed on time and to budget. A few months afterwards, the local electricity supplier announced that power would be cut to the site to allow local tree felling. Needless to say UCB carried on broadcasting regardless and without interruption thanks to their new UPS installation and backup generator. At the Burslem site, the EcoPowerSupplies team installed a Riello Multi Sentry 10kVA UPS system with a matching battery cabinet, wall mounted UPS maintenance bypass switch and SNMP remote interface. The new UPS protects all the IT and comms cabinets for the satellite office. The installation commenced on a Friday afternoon with the changeover completed later that evening following a controlled shutdown of the IT system.

Case studies and contacts details for references are available on request.

Typical Clients A-Z by Market Sector

SectorTypical Clients
BroadcastingBBC, Pinewood Studios, Sheperton Studios, Splice TV, United Christian Broadcasters
CharitiesAsthma UK, Breakthrough Breast Cancer, Children In Need, Shelter
ConstructionAmey, Balfour Beaty
EducationAberystwyth University, Bath Spa University, Birmingham University, Bournemouth University, Bristol University, Cardiff University, Coventry University, Instituto Cervantes London, King’s College London, Leeds Beckett University, South Gloucestershire and Stroud College, University of Bristol
EntertainmentEvolutions TV, Guinness World Records, Royal Gunpowder Mills, The Lawrence Backley Theatre
FacilitiesCBRE Ltd, Halcrow Group, Mott MacDonald, NHBC, Wates
Finance/InsuranceBank of England, Barclays Bank Plc, Bayern LB, Besso Group Insurance Brokers, Capita Plc, Carole Nash Insurance, CIMB Bank, Domestic and General Group Ltd, Equifax Ltd, Habib Bank AG Zurich, PKF (UK) LLP, Royal Bank of Scotland, SagePay, Swinton Insurance
Food/BeveragesSAB Miller
Health/MedicalBarnet and Chase Farm Hospital, Bradford NHS, NHS, NHS Wales, Southampton General Hospital, Spire Healthcare, University College Hospital
Hotel/LeisureApex Hotels, One Aldwych Hotel, HPS Hotels, London Marriott Hotel Park Lane
IndustrialHoneywell, Marathon Oil
ISPsDyn, GCI Com, ServerChoice
GovernmentBrighton & Hove City Council, Southend-on-Sea Borough Council
ManufacturingBritish Steel, HellermanTyton, Johnson Safety Products
MoDDTSL Fort Halstead
ReligionThe Diocese of Canterbury, The John Wallis Academy
RenewablesCuadrilla
RetailAldi, Marks & Spencer, Morrisons, Selfridges Retail, Westfield London Shopping Centre
SecurityChubb Fire and Security, Serco Group
TransportationGlobal Aerospace, London Southend Airport, London Underground
UtilitiesBT, National Grid, Thames Water

If you cannot find a sector listed please contact us and we will send you examples of the clients we have within it, where possible.